2011 Project List
Welcome to ESH Trace Heating Ltd's project list for 2011.
Wednesday 21 December 2011
The Saïd Business School, Oxford
The Saïd Business School is an academic department and the business school of the University of Oxford. Here ESH were contracted to design, supply and install a frost protection trace heating system to the water services external pipework. Over 650 metres of type FBT self regulating heating cable was installed to complete the system.
Thursday 15 December 2011
Libanus Primary School, Caerphilly
Designed, supplied and installed a frost protection trace heating system to the schools chilled water pipework. Type VC constant wattage heating cable was used throughout this contract.
St James Hospital, Leeds
ESH installed Raychem FS-C-2X and FS-A-2X heating cable to the hospitals pathology department as per clients specification. The heating systems were controlled by Raychem ECO Control 10 pipe sensing thermostats.
Greenvale AP Ltd, Market Drayton
ESH designed, supplied and installed a frost protection trace heating and thermal insulation system to the following pipework within this fresh potato packing site:
- Press pump and associated pipe
- High level pipe by hydrocyclones
- Plastic pipe to recycle tank
- Limewash pipe
- Coalgulating dosing pipe
- Regulating pumps and pipes
Wednesday 14 December 2011
Tullis Russel Coaters, Macclesfield
ESH supplied and installed over 260 metres of ESRS self regulating heating cable to provide a frost protection system to factory and warehouse sprinkler pipework.
Tuesday 13 December 2011
Mini Activity Youth Centre, Llandrindod Wells
Designed, supplied and installed a trace heating system to frost protect a short run of chilled water services pipework.
Monday 12 December 2011
St. Bart's Hospital, London
One of the largest heart rhythm centres in the world, here ESH were contracted to design, supply, install and commission a trace heating system to provide frost protection to the following externally mounted pipework:
- 786 metres of LTHW / AHU / RR pipework across levels 5, 6 and 7
- 70 metres of chilled water pipework across levels 5, 6 and 7
- 30 metres of basic cold water system pipework on level 5
Type VC constant wattage heating cable was installed throughout this project.