Victoria Train Station - London
For this project ESH supplied and installed 40m of frost protection trace heating within the water plantroom.
Monday, 31 January 2011
Friday, 28 January 2011
Friday, 21 January 2011
Thursday, 20 January 2011
Tuesday, 18 January 2011
Rhodia UK - Oldbury
This large project involved ESH suppling and installing both trace heating and thermal insulation to the following stainlees steel pipework:
This large project involved ESH suppling and installing both trace heating and thermal insulation to the following stainlees steel pipework:
- PPA pipework - This pipework needed to maintain a temperature of +110°C which required 540m of type SCB constant wattage heating tape
- TEA pipework - Required to maintain a temperature of +40°C, 95m of type SCB constant wattage tape installed
- Caustic soda pipework - 155m of type SCB constant wattage heating tape was required in order to maintain the required temperature of +30°C
- Reactor pipework - This pipework needed to maintain a temperature of +70°C and required 55m of type SCB tape to achieve this
Monday, 17 January 2011
Wednesday, 12 January 2011
Monday, 10 January 2011
Friday, 7 January 2011
Wednesday, 5 January 2011
Naburn WWTW
Our third project at Naburn WTW was our largest, ESH were contracted to provide frost protection to the follow pipework:
Our third project at Naburn WTW was our largest, ESH were contracted to provide frost protection to the follow pipework:
- Re-wetting pumps, 90m
- Centrifuge feed pumps, 70m
- Feed pipework for existing building, 70m
- Thick sludge part 1 & 2, 120m
- Existing pipework to tank, 70m
- Tank inlet pipework, 60m
- Buffered returns liqure returns pump, 35m