Thursday, 30 June 2011
Jaguar Landrover, Gaydon
ESH deigned and supplied a constant wattage trace heating system for the prevention of frost to external pipework. Installed by others on site.
Tuesday, 28 June 2011
London Dance Academy, Central Street (The Basement)
Finally a project which would allow our installation engineers to throw some shapes whilst working. For this large project, ESH were contracted to design, supply and install a trace heating system to frost protect pipework up to 150mm NB.
The pipework in question comprised of the sprinkler and boosted cold water pipes in the tank room and car park areas.
In total ESH installed just under 2000 metres of type VC constant wattage trace heating cable.
The pipework in question comprised of the sprinkler and boosted cold water pipes in the tank room and car park areas.In total ESH installed just under 2000 metres of type VC constant wattage trace heating cable.
Sainsburys Supermarkets, Poole & Dawlish
ESH supplied these projects with 325m of type VC constant wattage heating tape along with ancillaries.
Friday, 24 June 2011
One Hyde Park, London
One Hyde Park is a major residential and retail complex located in Knightsbridge, London. With prices ranging from £3.6 million for a one-bedroom flat to £136 million for a penthouse apartment, this truly was a breathtaking project to be apart of.
ESH were contacted to design, supply and install a hot water temperature maintenance trace heating system to the hot water services pipework, within the penthouse apartments.
In total over 650 metres of H2OWAT self regulating heating cable was installed to achieve the required temperature of +55°C.
ESH were contacted to design, supply and install a hot water temperature maintenance trace heating system to the hot water services pipework, within the penthouse apartments.
In total over 650 metres of H2OWAT self regulating heating cable was installed to achieve the required temperature of +55°C.
Thursday, 23 June 2011
Sirius Academy, Hull
Tuesday, 21 June 2011
Leaton Quarry, Telford
The recycle oil pipework required trace heating and thermal insulation in order to maintain a temperature of +50°C. ESH supplied and installed type VC constant wattage heating tape to the stainless steel pipework to achieve the required temperature.
Friday, 17 June 2011
Barclays Data Centre, Barnwood
Within this large data centre, ESH designed, supplied and installed a trace heating system to frost protect 8 sets of water cylinders. Each set comprises two adjacent steel bottles approximately 1.7m tall, 350mm diameter mounted in a steel cabinet, together with 1m of interconnecting pipework. Type VC constant wattage heating tape was installed throughout this project.
Thursday, 16 June 2011
Rhodia UK, Oldbury
Designed, supplied and installed trace heating for the frost protection of 90m of 25mm pipe in the CLB plant area.
Wednesday, 15 June 2011
Davyhulme WWTW, Manchester
Monday, 13 June 2011
Cardinal Heenan & Broughton Hall School, Liverpool
ESH were back in Liverpool to supply and installed a short run frost protection system to cold water pipework to a temporary boiler system.
Wednesday, 8 June 2011
Swanlea School, Whitechapel
The project scope here was to supply and install a trace heating system to temperature maintain the DHWS pipework at +55°C in an ambient temperature of +18°C. 160m of H2OWAT55 was required to complete the system.
Tuesday, 7 June 2011
Cardinal Heenan & Broughton Hall School
Supplied and installed a frost protection trace heating system to the following external kitchen pipework:
- Air handling unit pipe
- Cold water system pipe
- Hot water flow & return pipework
- 3 x CT pipework
Monday, 6 June 2011
Veolia Water, Telford
To supply materials only to trace heat the following applications: Frost protect the carrier water and sludge pump pipework and temperature maintain the caustic line pipework at +20°C.
Thursday, 2 June 2011
Rhodia UK, Oldbury
ESH were contracted to strip, supply and install trace heating and re-insulate three sets of pipework within a 'Phoshine' area:
- 16m of 1" stainless steel Acid pipework to be temperature maintained at +60°C
- 32m of 1" mild steel shower pipe to be frost protected
- 18m of 2" stainless steel vent line pipe to be frost protected