Rhws Primary School - Barry
Supplied type VC constant wattage heating tape in order to frost protection the schools sprinkler system.
Seedy Mill WTW - Lichfield
To supply and install a frost protection trace heating system to the rigid plastic and flexible plastic pipework.
Hanson School - Bradford
Supplied our trace heating monitoring units and thermostats to this project.
South East Resource Centre - Hackney
ESH supplied, installed and commissioned the trace heating system to perform the duty of maintaining the temperature of +55°C on the indoors mounted hot water services pipework. In total this project required 1010m of H2OWAT55 self regulating heating tape.
Blandford Leisure Centre - Dorset
Supplied this project with type ESRS self limiting trace heating tape.
Rhodia UK - Oldbury
A continuation of January's project, we supplied and installed an extra 125m of trace heating and thermal insulation onto the infill pipework.