For this project ESH supplied the materials and labour to install and commission a trace heating system to maintain the DHWS pipework at +55°C, this required over 200 metres of type H2OWAT65 self regulating heating cable in total.
Friday, 29 April 2011
Coca-Cola Enterprises, Wakefield
For this soft drink giant, ESH designed, supplied and installed two separate external frost protection 240v trace heating systems.
Thursday, 28 April 2011
ITW Foils, Pontypool
Supplied the materials to temperature maintain the duct pipework between +90°C and +100°C within a Zone 1, Gas group IIB Classification T1 Hazardous area.
Thursday, 21 April 2011
Formby Fire Station
Here ESH were contracted to design and supply materials and labour to install and commission a trace heating system to provide frost protection to over 200 metres of 32mm Ø MDPE pipework. Type VC constant wattage heating cable was installed during this project.
Wednesday, 20 April 2011
Mellor Primary School, Leicester
Supplied this project with factory terminated type VC constant wattage heating tape, ready to installed on site.
Tuesday, 19 April 2011
Beverley Tollesby School, Middlesbrough
Supplied this project with type VC constant wattage heating tape to provide frost protection to external pipework.
Thursday, 14 April 2011
Node 4 Data Centre, Northampton
ESH supplied and installed a trace heating system to provide frost protection to the following pipework: 68m x 300mm Ø, 2m x 125mm Ø, 110m x 100mm Ø, 25m x 28mm Ø.
Thursday, 7 April 2011
Golden Sands Holiday Park, Kinmell Bay
Within this family holiday park, ESH were contract to provide a frost protection trace heating system to the cold, hot and waste water pipework within two holiday lodges. In total ESH supplied and installed over 200 metres of type ESRS self regulating heating cable.
Friday, 1 April 2011