Thursday, 21 April 2011

Formby Fire Station

Here ESH were contracted to design and supply materials and labour to install and commission a trace heating system to provide frost protection to over 200 metres of 32mm Ø MDPE pipework. Type VC constant wattage heating cable was installed during this project.