Wednesday, 25 May 2011

Morpeth School, London

ESH designed, supplied and installed materials to perform the following duties: 
  • Provide frost protection on external LTHW and water services pipe work
  • Maintain a temperature of +50°C on internal domestic hot water services pipework mounted indoors

Over 300 metres of self regulating heating cable was installed to complete the two circuits.

No comments:

Post a Comment