Friday, 16 September 2011

Swanlea School, Whitechapel

Within this secondary school, ESH were contracted to replace 3 previously installed trace heating systems which were supplied and installed by others. The systems included 2 x external frost protection circuits and 1 x internal hot water temperature maintenance circuit.

No comments:

Post a Comment