Within this large data centre, ESH supplied and installed over 450 metres of type FBT self regulating trace heating cable. The system requirement was to provide frost protection to the external water services pipework.
Monday, 31 October 2011
Thursday, 27 October 2011
Kingspan Insulation Ltd, Leominster
Supplied and installed and trace heating system to frost protect a short run of external steel pipework between the factory and the CHP building.
Monday, 24 October 2011
Horiba Instruments, Northamptonshire
ESH designed, supplied and installed materials to heat raise the temperature of flexible stainless steel and copper tubing from +20°C up to +191°C.
Thursday, 20 October 2011
First Bus (Cumbernauld & Victorica Road), Glasgow
Our final project for First Bus saw ESH, design, supply and install a frost protection trace heating system to two identical sets of external pipework over two sites. In total over 250 metres of type VC constant wattage heating cable was installed.
First Bus (South Street), Glasgow
Provided frost protection to a run of external pipework similar to the other First Bus projects. The system was designed, supplied and installed use type VC constant wattage cable.
Wednesday, 19 October 2011
First Bus, Dumbarton
Type VC constant wattage trace heating tape was supplied and installed to provide frost protection to external pipework at this new bus depot site.
First Bus, Parkhead
Supplied and installed over 260 metres of constant wattage trace heating cable to provide frost protection within Parkhead's brand new bus depot.
Monday, 17 October 2011
First Bus, Dalkeith
The first of five projects for First Bus up in Scotland. This large new bus depot required over 700 metres of pipework frost protecting. ESH designed, supplied and installed the trace heating system utilising our type VC constant wattage cable.
Tuesday, 11 October 2011
New Strood Academy, Kent
For this large project within the new multi-million pound academy in Kent, ESH supplied and installed over 1500 metres of self regulating trace heating tape. The project scope was to:
- To provide frost protection to the CHW & LTHW pipework external on the roof.
- Maintain 55°C on the DHWS internal pipework.
Whitton Health Centre, Twickenham
Type FBT self regulating heating tape was supplied and installed to perform the duty of frost protecting the external water service pipework.
Caterpillar Re-manufacturing Services, Shrewsbury
Here at the European Remanufacturing Centre of the Caterpillar remanufacturing Services Division, ESH supplied and installed a frost protection trace heating system to a section of 150mm metal pipework within the cooling tower area.
Monday, 10 October 2011
Bovril Unilever, Burton Upon Trent
Abraham Darby Sports and Learning Community, Telford
Friday, 7 October 2011
Roger Bullivant Ltd, Burton-On-Trent
ESH designed, supplied and installed a process temperature maintenance trace heating system to a large plastic vessel 2.3m x 2.1m. The vessel required maintaining at a temperature between 10°C to 20°C.
Wednesday, 5 October 2011
Walford Timber, Herefordshire
Here we supplied and install a frost protection trace heating system to over 150 metres of external metal pipework up to 150mm in diameter.
Tuesday, 4 October 2011
Ribblesdale Plant, Lancashire
Supplied and installed the trace heating system and thermal insulation to provide frost protection to both metal and plastic external pipework.
Monday, 3 October 2011
Esholt WWTW
Within this waste water treatment works, ESH designed, supplied, installed and commissioned two trace heating systems to provide:
- Temperature maintenance of +15°C on two large caustic tanks (4m x 2m)
- Frost protection to external pipework