Monday, 3 October 2011

Esholt WWTW

Within this waste water treatment works, ESH designed, supplied, installed and commissioned two trace heating systems to provide:

  • Temperature maintenance of +15°C on two large caustic tanks (4m x 2m)
  • Frost protection to external pipework


No comments:

Post a Comment