- 786 metres of LTHW / AHU / RR pipework across levels 5, 6 and 7
- 70 metres of chilled water pipework across levels 5, 6 and 7
- 30 metres of basic cold water system pipework on level 5
Type VC constant wattage heating cable was installed throughout this project.
No comments:
Post a Comment