Thursday, 2 June 2011

Rhodia UK, Oldbury

ESH were contracted to strip, supply and install trace heating and re-insulate three sets of pipework within a 'Phoshine' area:

  • 16m of 1" stainless steel Acid pipework to be temperature maintained at +60°
  • 32m of 1" mild steel shower pipe to be frost protected 
  • 18m of 2" stainless steel vent line pipe to be frost protected

No comments:

Post a Comment