Friday, 17 June 2011

Barclays Data Centre, Barnwood

Within this large data centre, ESH designed, supplied and installed a trace heating system to frost protect 8 sets of water cylinders. Each set comprises two adjacent steel bottles approximately 1.7m tall, 350mm diameter mounted in a steel cabinet, together with 1m of interconnecting pipework. Type VC constant wattage heating tape was installed throughout this project.