Phoshine Plant, Oldbury
For this project ESH supplied and installed a trace heating and thermal insulation system for frost protecting two runs of cooing water pipework. The 2.5" diameter carbon steel pipes were straight traced with VCBOJ constant wattage heating tape.
New Primark Store, Stockport
Designed, supplied and installed a frost protection trace heating system to the external CHW and heating pipework. Over 220 metres of type VC constant wattage heating tape was installed.
Friday, 22 July 2011
Pen y Cefn WTW
For this water treatment works, ESH design, supplied and installed a frost protection trace heating system to the following areas:
- Sludge mix pipes
- Polyelectrolyte pipework
- Hose feed pipes
- Supernatant pipe
- Slude transfer pipeline
- Boosted cold water system
- Emergency shower feed pipes
Type VC 240v constant wattage heating cable was installed throughout this project.
Monday, 18 July 2011
Shap WTW
Friday, 15 July 2011
Hugbridge WWTW
A similar project to Shap WTW, ESH installed and supplied type FBT self regulating heating tape to frost protect plastic and metal pipework. 300m of trace heating cable was installed throughout this contract.
University of Wolverhampton Performance Hub
The University of Wolverhampton's school of sports, performing arts and leisure. Here ESH designed, supplied and installed a frost protection trace heating system to the external BCWS and CHW pipework on the buildings roof and ground floor.Over 430 metres of type VC constant wattage heating cable was installed throughout this project.
Thursday, 14 July 2011
Kingsway Tunnel, Liverpool
The Kingsway Tunnel (or Wallasey Tunnel) is a 1.5 mile tunnel under the River Mersey. Here ESH were contracted to design, supply and install a frost protection trace heating system to the water pipework in the hydrant stations underneath the main road in the tunnel. This large scale project required over 2.2km of constant wattage heating cable in total.
Bluewater Events Centre, Kent
Tuesday, 12 July 2011
Runways End Activity Centre, Aldershot
Provided frost protection to the BCWS pipework in the canoe building and the BCWS and rainwater pipe in the camping building. Overall we supplied and installed constant wattage heating cable to cover 200m of metal pipework.
Friday, 8 July 2011
Dartmouth Park Pavilion, West Bromwich
As part of the £6.3m restoration of West Bromwich's Dartmouth Park Pavilion, ESH were contracted to design, supply and install two separate trace heating systems:
- To temperature maintain the internal domestic hot water services pipework at +55°C
- Provide frost protection to the external chilled water pipework
Wednesday, 6 July 2011
UEL Primary School, Barking
To design, supply materials and labour to install, test and commission a trace heating and thermal insulation system to provide frost protection to sprinkler pipework.