Shap WTW
Within this new wastewater treatment works in Cumbrian Fells, ESH designed, supplied and installed a frost protection trace heating system to external plastic and metal pipework. In total ESH installed over 450 metres of type FBT self regulating heating cable.
No comments:
Post a Comment