Monday, 8 August 2011

Fullers Griffin Brewery, London

A brewery that dates back to 1828 and the home of London Pride and other award winning ales. Here ESH were contracted to design, supply and install a process temperature maintenance trace heating system to a large storage tank. The tank was required to maintain +85°in a minimum ambient of +5°C. Type VC constant wattage heating cable was installed throughout this project.

No comments:

Post a Comment