Welcome to ESH Trace Heating Ltd's project list for 2011.
Friday, 25 November 2011
Parkfield House, Altrincham
Designed, supplied and installed a trace heating system to temperature maintain the DHWS pipework at a pre set temperature of +55°C, then purge once a week via the HWATECO controller to 65°C.
No comments:
Post a Comment