2011 Project List

Welcome to ESH Trace Heating Ltd's project list for 2011.

Tuesday, 15 November 2011

Parkfield House, Altrincham

Designed, supplied and installed a trace heating system to maintain the domestic hot water pipework at +55°C with the facility to purge once a week.
Posted by Unknown at 06:43
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Altrincham, Hot Water Temperature Maintenance, Residential Buildings, Self Regulating

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2011 (143)
    • ►  December (16)
    • ▼  November (13)
      • Kings College, London
      • Parkfield House, Altrincham
      • Oasis Academy Mayfield, Southampton
      • St Andrews Healthcare, Birmingham
      • S&A Foods, Derby
      • Rainford High Technology College, St Helens
      • Parkfield House, Altrincham
      • Glaxo Smith Kline, Nottingham
      • St John Cass Redcoat School, London
      • ABN Animal Foods, Leeds
      • 333 The Strand, London
      • Kingspan Insulation, Leominster
      • Dairy Crest, Crudgington
    • ►  October (17)
    • ►  September (10)
    • ►  August (17)
    • ►  July (11)
    • ►  June (14)
    • ►  May (9)
    • ►  April (9)
    • ►  March (6)
    • ►  February (10)
    • ►  January (11)

Contributors

  • ESH Trace Heating Ltd
  • Unknown
Simple theme. Theme images by mariusFM77. Powered by Blogger.