Wednesday, 21 December 2011
The Saïd Business School, Oxford
Thursday, 15 December 2011
Libanus Primary School, Caerphilly
Designed, supplied and installed a frost protection trace heating system to the schools chilled water pipework. Type VC constant wattage heating cable was used throughout this contract.
St James Hospital, Leeds
ESH installed Raychem FS-C-2X and FS-A-2X heating cable to the hospitals pathology department as per clients specification. The heating systems were controlled by Raychem ECO Control 10 pipe sensing thermostats.
Greenvale AP Ltd, Market Drayton
ESH designed, supplied and installed a frost protection trace heating and thermal insulation system to the following pipework within this fresh potato packing site:
- Press pump and associated pipe
- High level pipe by hydrocyclones
- Plastic pipe to recycle tank
- Limewash pipe
- Coalgulating dosing pipe
- Regulating pumps and pipes
Wednesday, 14 December 2011
Tullis Russel Coaters, Macclesfield
ESH supplied and installed over 260 metres of ESRS self regulating heating cable to provide a frost protection system to factory and warehouse sprinkler pipework.
Tuesday, 13 December 2011
Mini Activity Youth Centre, Llandrindod Wells
Designed, supplied and installed a trace heating system to frost protect a short run of chilled water services pipework.
Monday, 12 December 2011
St. Bart's Hospital, London
One of the largest heart rhythm centres in the world, here ESH were contracted to design, supply, install and commission a trace heating system to provide frost protection to the following externally mounted pipework:

- 786 metres of LTHW / AHU / RR pipework across levels 5, 6 and 7
- 70 metres of chilled water pipework across levels 5, 6 and 7
- 30 metres of basic cold water system pipework on level 5
Type VC constant wattage heating cable was installed throughout this project.
Friday, 9 December 2011
Denco Lubrication, Herefordshire
Supplied and installed a trace heating and thermal insulation system to frost protect pipework within two skids. Our design calculations were based on maintaining +10°C against a minimum ambient temperature of -42°C.
Thursday, 8 December 2011
Farm Road Health Centre, Birmingham
For this health centre, ESH supplied and installed a trace heating system to frost protect a section of internal and external pipework including 2 pumps.
Wednesday, 7 December 2011
Adlington WWTW
At this waste water treatment works, ESH were contracted to supply and install a 110v self regulating trace heating system to provide frost protection. The trace heating circuits were controlled using type JBT air sensing thermostats.
Tuesday, 6 December 2011
Toyota Manufacturing UK, Derby
Within this massive car manufacturing unit, ESH designed, supplied and installed a process temperature maintenance system in order to maintain a run of adhesive supply pipework at +35°C. Type SC constant wattage trace heating cable was used during this project.
MRC Laboratory of Molecular Biology, Cambridge
The LMB is a purpose built building for the Medical Research Council, providing first class facilities to some of the world's leading scientists. Here ESH were contracted to design, supply and install a frost protection trace heating system to both the hot and cold water services pipework. Type FBT self regulating heating cable was utilising throughout this project.
Monday, 5 December 2011
Thorne WTW
Type FBT self regulating heating tape was straight traced underneath 65mm, 40mm and 25mm NB UPVC pipework to provide frost protection. This self regulating system was designed, supplied and installed by ESH.
Friday, 2 December 2011
ASDA Store, Llandudno
Here ESH were contracted to test the existing constant wattage trace heating system already installed and repair any damaged sections with similar tape. 50m of tape had to be replaced due to on site damage coursed by others.
Factories 1 & 2, Wrexham Industrial Estate
ESH designed, supplied and installed a frost protection system to pipework and three tank conical bases. The tanks included two sludge tanks and one hot water tank.
Thursday, 1 December 2011
FMA Process Engineering Ltd, Lichfield
ESH were contracted to design and supply trace heating material to temperature maintain liquid sugar pipework at +55°C. Goods were packaged and delivered for final export to Nigeria.
Wednesday, 30 November 2011
Kings College, London
King's is one of the world's leading research and teaching universities based in the heart of London. This trace heating project was split into two sections:
Over 470 metres of trace heating cable was installed in total.
- Provide hot water temperature maintenance of +65°C to the heating pipework using type H2OWAT65 heating cable
Over 470 metres of trace heating cable was installed in total.
Friday, 25 November 2011
Parkfield House, Altrincham
Designed, supplied and installed a trace heating system to temperature maintain the DHWS pipework at a pre set temperature of +55°C, then purge once a week via the HWATECO controller to 65°C.
Wednesday, 23 November 2011
Oasis Academy Mayfield, Southampton
Within this brand new academy, ESH were contracted to provide frost protection trace heating to the schools internal sprinkler system. Type WinterTrace constant wattage heating cable was supplied and installed on this dual heating system and was controlled via a dual circuit, automatic switch over unit.
Tuesday, 22 November 2011
St Andrews Healthcare, Birmingham
Type VCB constant wattage heating cable was supplied and installed to provide frost protection to three sets of 1.5" NB steel pipework
Thursday, 17 November 2011
S&A Foods, Derby
For this leading manufacturer of Indian ready meals, ESH designed, supplied and installed a trace heating system to frost protect a short run of external steel pipework.
Labels:
Derby,
Frost Protection,
Industrial Building
Location:
Derby, UK
Wednesday, 16 November 2011
Rainford High Technology College, St Helens
For this large scale refurbishment of Rainford High, ESH designed, supplied and installed an external trace heating system to provide frost protection to the roof mounted water services pipework. Type VCB constant wattage heating cable was installed throughout this project.
Tuesday, 15 November 2011
Parkfield House, Altrincham
Designed, supplied and installed a trace heating system to maintain the domestic hot water pipework at +55°C with the facility to purge once a week.
Glaxo Smith Kline, Nottingham
Installation of a type DTC digital thermostat to existing trace heating system.
Wednesday, 9 November 2011
St John Cass Redcoat School, London
Sir John Cass's Foundation and Redcoat School is a Church of England School in the east end of London. Here we supplied and installed a digital thermostats to the existing trace heating tape, after testing the system for faults.
ABN Animal Foods, Leeds
ABN is the leading British manufacturer of pig and poultry compound feed. Within the Leeds based manufacturing plant, ESH supplied and installed a frost protection system to all external pipework.
Tuesday, 8 November 2011
333 The Strand, London
ESH designed, supplied and installed a hot water temperature maintenance trace heating system to over 200 metres of HWS pipework. The system requirement was to protect against Legionella. Type H2OWAT self regulating heating cable was installed to achieve the desired temperatures.
Friday, 4 November 2011
Kingspan Insulation, Leominster
For this leading manufacturer of thermal insulation, ESH supplied and installed a constant wattage frost protection trace heating system to external cold water pipework.
Wednesday, 2 November 2011
Dairy Crest, Crudgington

A local project for ESH, who were contracted to design, supply and install a trace heating system to frost protect the follow pipework:
- Brine pipework
- Make up water pipes
- Bore hole water pipework
- Towns water pipework
- Softener pipe pipes
Type VC constant wattage heating cable was used throughout this project.
Monday, 31 October 2011
Santander Data Centre, Milton Keynes
Within this large data centre, ESH supplied and installed over 450 metres of type FBT self regulating trace heating cable. The system requirement was to provide frost protection to the external water services pipework.
Thursday, 27 October 2011
Kingspan Insulation Ltd, Leominster
Supplied and installed and trace heating system to frost protect a short run of external steel pipework between the factory and the CHP building.
Monday, 24 October 2011
Horiba Instruments, Northamptonshire
ESH designed, supplied and installed materials to heat raise the temperature of flexible stainless steel and copper tubing from +20°C up to +191°C.
Thursday, 20 October 2011
First Bus (Cumbernauld & Victorica Road), Glasgow
Our final project for First Bus saw ESH, design, supply and install a frost protection trace heating system to two identical sets of external pipework over two sites. In total over 250 metres of type VC constant wattage heating cable was installed.
First Bus (South Street), Glasgow
Provided frost protection to a run of external pipework similar to the other First Bus projects. The system was designed, supplied and installed use type VC constant wattage cable.
Wednesday, 19 October 2011
First Bus, Dumbarton
Type VC constant wattage trace heating tape was supplied and installed to provide frost protection to external pipework at this new bus depot site.
First Bus, Parkhead
Supplied and installed over 260 metres of constant wattage trace heating cable to provide frost protection within Parkhead's brand new bus depot.
Monday, 17 October 2011
First Bus, Dalkeith
The first of five projects for First Bus up in Scotland. This large new bus depot required over 700 metres of pipework frost protecting. ESH designed, supplied and installed the trace heating system utilising our type VC constant wattage cable.
Tuesday, 11 October 2011
New Strood Academy, Kent
For this large project within the new multi-million pound academy in Kent, ESH supplied and installed over 1500 metres of self regulating trace heating tape. The project scope was to:
- To provide frost protection to the CHW & LTHW pipework external on the roof.
- Maintain 55°C on the DHWS internal pipework.
Whitton Health Centre, Twickenham
Type FBT self regulating heating tape was supplied and installed to perform the duty of frost protecting the external water service pipework.
Caterpillar Re-manufacturing Services, Shrewsbury
Here at the European Remanufacturing Centre of the Caterpillar remanufacturing Services Division, ESH supplied and installed a frost protection trace heating system to a section of 150mm metal pipework within the cooling tower area.
Monday, 10 October 2011
Bovril Unilever, Burton Upon Trent
Abraham Darby Sports and Learning Community, Telford
Friday, 7 October 2011
Roger Bullivant Ltd, Burton-On-Trent
ESH designed, supplied and installed a process temperature maintenance trace heating system to a large plastic vessel 2.3m x 2.1m. The vessel required maintaining at a temperature between 10°C to 20°C.
Wednesday, 5 October 2011
Walford Timber, Herefordshire
Here we supplied and install a frost protection trace heating system to over 150 metres of external metal pipework up to 150mm in diameter.
Tuesday, 4 October 2011
Ribblesdale Plant, Lancashire
Supplied and installed the trace heating system and thermal insulation to provide frost protection to both metal and plastic external pipework.
Monday, 3 October 2011
Esholt WWTW
Within this waste water treatment works, ESH designed, supplied, installed and commissioned two trace heating systems to provide:
- Temperature maintenance of +15°C on two large caustic tanks (4m x 2m)
- Frost protection to external pipework
Friday, 30 September 2011
Oulton Primary School, Leeds
For this newly built primary school, ESH designed, supplied and installed a frost protection trace heating system to the external chilled water services pipework. Just shy of 500 metres of type FBT self regulating heating cable was installed throughout this project.
Tuesday, 27 September 2011
Bell Packaging Europe, Wrexham
Within this aluminium can manufacturing plant, ESH design, supplied and installed both the trace heating and thermal insulation to provided a frost protection system.
Monday, 26 September 2011
Sanofi Aventis, Cheshire
Sanofi Aventis is one of the worlds largest pharmaceutical companies. Here within their Cheshire based manufacturing centre, ESH designed, supplied and installed an electrically hazardous area frost protection system. Type SCBX constant wattage trace heating cable was installed along with the thermal insulation to achieve a stabilised system.
First Bus, Blantyre
Designed, supplied and installed a frost protection trace heating system to the main tank and carbon filters. Type ESRS self limiting heating tape was installed throughout this project.
Friday, 16 September 2011
Swanlea School, Whitechapel
Within this secondary school, ESH were contracted to replace 3 previously installed trace heating systems which were supplied and installed by others. The systems included 2 x external frost protection circuits and 1 x internal hot water temperature maintenance circuit.
Queen Elizabeth Hospital, Woolwich
Over 300 metres of type FBT self regulating trace heating tape was supplied and installed to provide frost protection to the external water services pipework on top of the hospitals roof.
Friday, 9 September 2011
Stepan UK Ltd, Stalybridge
For this large chemical manufacturer, ESH designed, supplied and installed a process temperature maintenance trace heating system to the pipework within the Sulphonation Plant.
Kettle Foods Ltd, Norwich
For this tasty little project, ESH designed, supplied and installed a frost protection trace heating and thermal insulation system to a run of 100mm NB pipework containing water.
Tuesday, 6 September 2011
Pirelli Tyres, Burton-On-Trent
For this tyre giant, ESH were contracted to provide a frost protection trace heating system to the external building services pipework. ESH designed, supplied and installed type FBT self regulating heating cable to prevent the pipework dropping below +5°C.
Friday, 2 September 2011
Bournville House, Telford
Wednesday, 31 August 2011
Ikea, Wednesbury
A true retailing giant! Within Ikea's gigantic Wednsebury store, ESH were contracted to design, supply and install two separate trace heating systems:

Self regulating heating cable was installed on both circuits, type FBT for frost protection and type H2OWAT for temperature maintenance.

- System one was for the frost protection of over 200 metres of cold water pipework
- System two for the hot water temperature maintenance of over 250 metres of DHWS pipework
Self regulating heating cable was installed on both circuits, type FBT for frost protection and type H2OWAT for temperature maintenance.
Friday, 26 August 2011
Daveyhulme WTW
To design and supply materials, tools and labour to install and commission a trace heating system to frost protect external pipework.
Thursday, 25 August 2011
Robinson Brothers Ltd, West Bromwich
Within this chemical manufacturing plant which was deemed to be electrically hazardous, ESH supplied and installed an ATEX Certified trace heating system to provide frost protection to a large section of steel pipework. The system was designed using our ATEX Approved constant wattage heating tape SCBX and controlled with an explosive atmosphere air sensing thermostat. Mellor Community Primary School, Leicester
ESH were contracted to design, supply and install a frost protection system to a run of plastic pipework associated with the air handling unit. Over 200 metres of type VCB constant wattage trace heating cable was installed throughout this project.
Tuesday, 23 August 2011
Poeka Beck WTW
Designed and supplied materials, tools and labour to install and commission a trace heating system to frost protect external pipework.
Holy Springs School, Bracknell
Within this small junior school, ESH supplied and installed a trace heating system to provide hot water temperature maintenance to the HWS pipework. The pipework required maintaining at +55°C and this was achieved using type H2OWAT self regulating heating cable.
Friday, 19 August 2011
New H&M Store, Newbury
Before the opening of this brand new H&M store, ESH designed, supplied and installed a frost protection trace heating system to the internal sprinkler pipework on both the ground and first floor areas.
Thursday, 18 August 2011
St Mary's Hospital, Portsmouth
Supplied the hospital with our trace heating monitoring and automatic switch over units.
Labels:
Health Care,
Portsmouth
Location:
Portsmouth, UK
Wednesday, 17 August 2011
Lister Hospital - Stevenage
ESH were contracted to design and supply materials and labour to install multiple ramp trace heating systems, utilising self regulating heating tape to prevent snow settlement and ice formation on the hospitals multi storey car park.
To achieve this a loading of 180 watts per m² was required, by using heating tape rated at 30 w/m set to 150-200mm spacing, this gave us an installed length of 6m of heating tape per m² of ramp floor area.
In total over 1500 metres of type FBT self regulating heating tape was installed throughout this project.
To achieve this a loading of 180 watts per m² was required, by using heating tape rated at 30 w/m set to 150-200mm spacing, this gave us an installed length of 6m of heating tape per m² of ramp floor area.
In total over 1500 metres of type FBT self regulating heating tape was installed throughout this project.
Hampshire Council Project
This project for Hampshire Council involved designing, supplying materials, and labour to install a trace heating system to frost protect multiple vessels across five depot sites.
Tuesday, 16 August 2011
Shrewsbury Fire Station
ESH supplied and installed type VC constant wattage heating tape to provide a frost protection system to the sprinkler pipework within the roof top tank room.
Wednesday, 10 August 2011
Glaxo Smith Kline, Hertfordshire
For this Raychem specified project, ESH installed Raychem self regulating heating tape to provide frost protection to the mains colds water, chilled water and HTG pipework.
Monday, 8 August 2011
Fullers Griffin Brewery, London
A brewery that dates back to 1828 and the home of London Pride and other award winning ales. Here ESH were contracted to design, supply and install a process temperature maintenance trace heating system to a large storage tank. The tank was required to maintain +85°C in a minimum ambient of +5°C. Type VC constant wattage heating cable was installed throughout this project.QVC Head Office, Chiswick
Saturday, 6 August 2011
John Lewis Home, Tamworth
For this retailing giant, ESH designed, supplied and installed a frost protection trace heating system to the external water services pipework. In total over 200 metres of FBT self regulating heating cable was installed within this brand new store.
Thursday, 4 August 2011
Drayton Manor Park
Tuesday, 2 August 2011
Bushboard Ltd, Northants
Over 280 metres of type VCB constant wattage heating tape was supplied and installed to provide a frost protection system to the external water services pipework.
Wednesday, 27 July 2011
Phoshine Plant, Oldbury
For this project ESH supplied and installed a trace heating and thermal insulation system for frost protecting two runs of cooing water pipework. The 2.5" diameter carbon steel pipes were straight traced with VCBOJ constant wattage heating tape.
New Primark Store, Stockport
Designed, supplied and installed a frost protection trace heating system to the external CHW and heating pipework. Over 220 metres of type VC constant wattage heating tape was installed.
Friday, 22 July 2011
Pen y Cefn WTW
For this water treatment works, ESH design, supplied and installed a frost protection trace heating system to the following areas:
- Sludge mix pipes
- Polyelectrolyte pipework
- Hose feed pipes
- Supernatant pipe
- Slude transfer pipeline
- Boosted cold water system
- Emergency shower feed pipes
Type VC 240v constant wattage heating cable was installed throughout this project.
Monday, 18 July 2011
Shap WTW
Friday, 15 July 2011
Hugbridge WWTW
A similar project to Shap WTW, ESH installed and supplied type FBT self regulating heating tape to frost protect plastic and metal pipework. 300m of trace heating cable was installed throughout this contract.
University of Wolverhampton Performance Hub
The University of Wolverhampton's school of sports, performing arts and leisure. Here ESH designed, supplied and installed a frost protection trace heating system to the external BCWS and CHW pipework on the buildings roof and ground floor.Over 430 metres of type VC constant wattage heating cable was installed throughout this project.
Thursday, 14 July 2011
Kingsway Tunnel, Liverpool
The Kingsway Tunnel (or Wallasey Tunnel) is a 1.5 mile tunnel under the River Mersey. Here ESH were contracted to design, supply and install a frost protection trace heating system to the water pipework in the hydrant stations underneath the main road in the tunnel. This large scale project required over 2.2km of constant wattage heating cable in total.
Bluewater Events Centre, Kent
Tuesday, 12 July 2011
Runways End Activity Centre, Aldershot
Provided frost protection to the BCWS pipework in the canoe building and the BCWS and rainwater pipe in the camping building. Overall we supplied and installed constant wattage heating cable to cover 200m of metal pipework.
Friday, 8 July 2011
Dartmouth Park Pavilion, West Bromwich
As part of the £6.3m restoration of West Bromwich's Dartmouth Park Pavilion, ESH were contracted to design, supply and install two separate trace heating systems:
- To temperature maintain the internal domestic hot water services pipework at +55°C
- Provide frost protection to the external chilled water pipework
Wednesday, 6 July 2011
UEL Primary School, Barking
To design, supply materials and labour to install, test and commission a trace heating and thermal insulation system to provide frost protection to sprinkler pipework.
Thursday, 30 June 2011
Jaguar Landrover, Gaydon
ESH deigned and supplied a constant wattage trace heating system for the prevention of frost to external pipework. Installed by others on site.
Tuesday, 28 June 2011
London Dance Academy, Central Street (The Basement)
Finally a project which would allow our installation engineers to throw some shapes whilst working. For this large project, ESH were contracted to design, supply and install a trace heating system to frost protect pipework up to 150mm NB.
The pipework in question comprised of the sprinkler and boosted cold water pipes in the tank room and car park areas.
In total ESH installed just under 2000 metres of type VC constant wattage trace heating cable.
The pipework in question comprised of the sprinkler and boosted cold water pipes in the tank room and car park areas.In total ESH installed just under 2000 metres of type VC constant wattage trace heating cable.
Sainsburys Supermarkets, Poole & Dawlish
ESH supplied these projects with 325m of type VC constant wattage heating tape along with ancillaries.
Friday, 24 June 2011
One Hyde Park, London
One Hyde Park is a major residential and retail complex located in Knightsbridge, London. With prices ranging from £3.6 million for a one-bedroom flat to £136 million for a penthouse apartment, this truly was a breathtaking project to be apart of.
ESH were contacted to design, supply and install a hot water temperature maintenance trace heating system to the hot water services pipework, within the penthouse apartments.
In total over 650 metres of H2OWAT self regulating heating cable was installed to achieve the required temperature of +55°C.
ESH were contacted to design, supply and install a hot water temperature maintenance trace heating system to the hot water services pipework, within the penthouse apartments.
In total over 650 metres of H2OWAT self regulating heating cable was installed to achieve the required temperature of +55°C.
Thursday, 23 June 2011
Sirius Academy, Hull
Tuesday, 21 June 2011
Leaton Quarry, Telford
The recycle oil pipework required trace heating and thermal insulation in order to maintain a temperature of +50°C. ESH supplied and installed type VC constant wattage heating tape to the stainless steel pipework to achieve the required temperature.
Friday, 17 June 2011
Barclays Data Centre, Barnwood
Within this large data centre, ESH designed, supplied and installed a trace heating system to frost protect 8 sets of water cylinders. Each set comprises two adjacent steel bottles approximately 1.7m tall, 350mm diameter mounted in a steel cabinet, together with 1m of interconnecting pipework. Type VC constant wattage heating tape was installed throughout this project.
Thursday, 16 June 2011
Rhodia UK, Oldbury
Designed, supplied and installed trace heating for the frost protection of 90m of 25mm pipe in the CLB plant area.
Wednesday, 15 June 2011
Davyhulme WWTW, Manchester
Monday, 13 June 2011
Cardinal Heenan & Broughton Hall School, Liverpool
ESH were back in Liverpool to supply and installed a short run frost protection system to cold water pipework to a temporary boiler system.
Wednesday, 8 June 2011
Swanlea School, Whitechapel
The project scope here was to supply and install a trace heating system to temperature maintain the DHWS pipework at +55°C in an ambient temperature of +18°C. 160m of H2OWAT55 was required to complete the system.
Tuesday, 7 June 2011
Cardinal Heenan & Broughton Hall School
Supplied and installed a frost protection trace heating system to the following external kitchen pipework:
- Air handling unit pipe
- Cold water system pipe
- Hot water flow & return pipework
- 3 x CT pipework
Monday, 6 June 2011
Veolia Water, Telford
To supply materials only to trace heat the following applications: Frost protect the carrier water and sludge pump pipework and temperature maintain the caustic line pipework at +20°C.
Thursday, 2 June 2011
Rhodia UK, Oldbury
ESH were contracted to strip, supply and install trace heating and re-insulate three sets of pipework within a 'Phoshine' area:
- 16m of 1" stainless steel Acid pipework to be temperature maintained at +60°C
- 32m of 1" mild steel shower pipe to be frost protected
- 18m of 2" stainless steel vent line pipe to be frost protected
Friday, 27 May 2011
Stepan UK, Cheshire
Type TF teflon coated constant wattage heating tape was supplied and installed to maintain a temperature of +40°C on a section of blow heat pipework.
Wednesday, 25 May 2011
Morpeth School, London
ESH designed, supplied and installed materials to perform the following duties:
- Provide frost protection on external LTHW and water services pipe work
- Maintain a temperature of +50°C on internal domestic hot water services pipework mounted indoors
Over 300 metres of self regulating heating cable was installed to complete the two circuits.
Friday, 20 May 2011
Cambridge & Cresent Tower, Birmingham
Within these large tower blocks, ESH design, supplied and installed a frost protection trace heating system to the external chilled water pipework. Type VC constant wattage heating tape was used throughout this project.
Thursday, 12 May 2011
Britannia Food Ingredients, Goole
ESH supplied over 250m of type SC constant wattage heating tape to this project.
Wednesday, 11 May 2011
Balfour Beatty Engineering Services, Wednesbury
This project involved supplying and installing a trace heating system to frost protect pipework inside three plant room modules. Each module had approximately 23m of cooper cold water pipe, 8m of stainlees steel cold water pipe, 4m of DHWS copper pipe and 42m of heating pipe.
Monday, 9 May 2011
Sackville Building, Manchester University
Friday, 6 May 2011
St. Mary's Hospital, Portsmouth
ESH installed Raychem FS-A-2X self regulating heating tape to provide frost protection to the water services pipework.
Thursday, 5 May 2011
Arena Central, Car Park, Birmingham
Supplied and installed both trace heating and thermal insulation onto a short run of sprinkler valve pipework within the car park area.
Wednesday, 4 May 2011
Magna Confectioners, Telford
Magna required the temperature maintenance of three lick roller units at +40°C, each unit was 950mm x 140mm curved. ESH designed and supplied 3 silicone heating mats 200w at 240v.
Friday, 29 April 2011
Rhodes Avenue Primary School, London
For this project ESH supplied the materials and labour to install and commission a trace heating system to maintain the DHWS pipework at +55°C, this required over 200 metres of type H2OWAT65 self regulating heating cable in total.
Coca-Cola Enterprises, Wakefield
For this soft drink giant, ESH designed, supplied and installed two separate external frost protection 240v trace heating systems.
Thursday, 28 April 2011
ITW Foils, Pontypool
Supplied the materials to temperature maintain the duct pipework between +90°C and +100°C within a Zone 1, Gas group IIB Classification T1 Hazardous area.
Thursday, 21 April 2011
Formby Fire Station
Here ESH were contracted to design and supply materials and labour to install and commission a trace heating system to provide frost protection to over 200 metres of 32mm Ø MDPE pipework. Type VC constant wattage heating cable was installed during this project.
Wednesday, 20 April 2011
Mellor Primary School, Leicester
Supplied this project with factory terminated type VC constant wattage heating tape, ready to installed on site.
Tuesday, 19 April 2011
Beverley Tollesby School, Middlesbrough
Supplied this project with type VC constant wattage heating tape to provide frost protection to external pipework.
Thursday, 14 April 2011
Node 4 Data Centre, Northampton
ESH supplied and installed a trace heating system to provide frost protection to the following pipework: 68m x 300mm Ø, 2m x 125mm Ø, 110m x 100mm Ø, 25m x 28mm Ø.
Thursday, 7 April 2011
Golden Sands Holiday Park, Kinmell Bay
Within this family holiday park, ESH were contract to provide a frost protection trace heating system to the cold, hot and waste water pipework within two holiday lodges. In total ESH supplied and installed over 200 metres of type ESRS self regulating heating cable.
Friday, 1 April 2011
Monday, 28 March 2011
Monday, 21 March 2011
Thursday, 10 March 2011
Monday, 7 March 2011
Friday, 4 March 2011
Monday, 28 February 2011
Bournville House - TelfordWithin Lightmoor Village, Bournville House is a 'Extra Care Housing' building offering traditional sheltered housing. For this project ESH supplied and installed 825m of H2OWAT65 self limiting trace heating tape to the HWS pipework in order to maintain the temperature at +65°C.
Thursday, 24 February 2011
Friday, 18 February 2011
Thursday, 17 February 2011
Tuesday, 15 February 2011
Monday, 14 February 2011
Nuffield Orthopaedic Centre - Oxford
Within the biomedical research unit, ESH supplied materials and labour to install, test and commission a trace heating system to maintain a temperature of +55°C on the hot water services pipework. In total 120m of H2OWAT55 self regulating heating tape was required.
Within the biomedical research unit, ESH supplied materials and labour to install, test and commission a trace heating system to maintain a temperature of +55°C on the hot water services pipework. In total 120m of H2OWAT55 self regulating heating tape was required.
Wednesday, 9 February 2011
Friday, 4 February 2011
Leicester University CRF
The following pipework within the Central Research Facility building required trace heating to provide frost protection using Raychem heating tape: - Cold Water Service pipework, 30m
- Basic cold water service pipework, 30m
- Chilled water pipework, 80m
- Tank plantroom pipework, 140m
Thursday, 3 February 2011
Tuesday, 1 February 2011
Monday, 31 January 2011
Friday, 28 January 2011
Friday, 21 January 2011
Thursday, 20 January 2011
Tuesday, 18 January 2011
Rhodia UK - Oldbury
This large project involved ESH suppling and installing both trace heating and thermal insulation to the following stainlees steel pipework:
This large project involved ESH suppling and installing both trace heating and thermal insulation to the following stainlees steel pipework:
- PPA pipework - This pipework needed to maintain a temperature of +110°C which required 540m of type SCB constant wattage heating tape
- TEA pipework - Required to maintain a temperature of +40°C, 95m of type SCB constant wattage tape installed
- Caustic soda pipework - 155m of type SCB constant wattage heating tape was required in order to maintain the required temperature of +30°C
- Reactor pipework - This pipework needed to maintain a temperature of +70°C and required 55m of type SCB tape to achieve this
Monday, 17 January 2011
Wednesday, 12 January 2011
Monday, 10 January 2011
Friday, 7 January 2011
Wednesday, 5 January 2011
Naburn WWTW
Our third project at Naburn WTW was our largest, ESH were contracted to provide frost protection to the follow pipework:
Our third project at Naburn WTW was our largest, ESH were contracted to provide frost protection to the follow pipework:
- Re-wetting pumps, 90m
- Centrifuge feed pumps, 70m
- Feed pipework for existing building, 70m
- Thick sludge part 1 & 2, 120m
- Existing pipework to tank, 70m
- Tank inlet pipework, 60m
- Buffered returns liqure returns pump, 35m
Subscribe to:
Comments (Atom)